The remodel opened up the kitchen to the dining and living room, relocated the laundry from the basement to the Main Floor, provided a new open stairwell and stair with metal railing, added a powder room, and remodeled the master bathroom. The Lower Floor was remodeled to create a guest suite and hallway to the new stair. The south-facing deck was enlarged and new glass-panel railings and PVC decking were installed.
Construction Completion: 2011
Contractor: Brad Griffith /Home Improvement and Maintenance, Sequim